色猫av-色猫成人网-色妹子在线-色妹子综合-欧美日韩色片-欧美日韩影院

Hello, welcome to visit Guangzhou Flying Butterfly Stage Lighting Equipment Co., LTD's official website!
ENGLISH
中文
Language Selection:
TECHNICAL SUPPORT
First to understand the needs of the customers, listen to the customer with an open mind.
After-sales Service Technical Help Download News
The stage lighting equipment maintenance?
Release Date:[2016/6/24 16:50:29]   Total read [2340] Times

Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:wfw04@163.com
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://www.dcjianghu.net

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 国产成人在线电影| 好男人在线社区www| 美女被男人扒开腿猛视频| 真希友田视频中文字幕在线看| 97久久久亚洲综合久久88| 夫妇野外交换hd中文小说 | 国产一区二区精品| 动漫美女吸乳羞羞动漫| 中文字幕国语对白在线电影| 夜夜影院未满十八勿进| 韩国免费人成在线观看网站 | 免费污视频在线| 色综合久久伊人| 亚洲精品国产综合久久一线| 干妞网免费视频| 国产成人精品久久| 日本三人交xxx69视频| 国产日韩欧美亚洲| 欧美一级大片在线观看| 夫妇交换俱乐部微信群| 高h视频在线免费观看| 一级片在哪里看| 18观看免费永久视频| 老公去上班的午后时光| 久久午夜神器| 久久er国产精品免费观看2| 亚洲欧美日韩国产综合| 久久99国产精品久久99果冻传媒| 女人18毛片a级毛片| 色播在线电影| 猫扑两性色午夜视频免费| 翁虹三级伦理电影大全在线观看| 老头猛挺进小莹的体内小说全集| 中文字幕在线视频网站| 工囗番漫画全彩无遮挡| 黄色三级电影免费| a级毛片免费网站| 成年人性生活片| 精品国产污污免费网站入口| 韩国免费一级片| 波多野吉衣在线电影|
Service
Service